comes to an end in Sept 2010.
ProCure21 Key Performance Indicators show that over the past six years ProCure21 clients are very satisfied with their final product and service received. General defects are minor, safety figures are above industry average and cost and time predictability figures show good performance. Other indicators show that ProCure21 schemes are no more expensive than traditionally procured schemes and significant cost savings can be made through a shorter tender and construction time periods. Year on year performance figures
Footnotes
Comparing costs How ProCure21 out-turn costs compare with traditional* contracting over a range of clinical facility types.
All costs shown are per m² gross internal floor area and at MIPS 489 and location factor 1.00. All costs exclude demolition and site preparation, site abnormals, external works, Group 2,3&4 fittings and equipment, professional fees, contingency and VAT. * Building Cost Information Service - Royal Institution of Chartered Surveyors. Other cost savings ProCure21 contracts are not required to be advertised in accordance with EU rules. This provides an average estimated time saving of six months per contract. The BCIS survey of tender prices (Q4-2007) forecasted a tender price rise of 5.1%. A six month time saving would therefore equate to approximately 2.55% capital cost saving over this period. Analysis of ProCure21 schemes show comparatively shorter construction periods - 7 weeks for schemes between £1-5m and 17weeks for schemes between £5-15m. This could equate to cost savings of approximately 1% of capital cost depending on changing tender index figures. |
NHS ProCure21 current status
18 schemes registered in the past 3 months
10 phase 2 (obc)
106 phase 4 (construction)
PSCP case study for NHS ProCure21
Sunderland Primary Care Trust
Grindon Lane Centre
![]() Accolade for NHS ProCure21
Dear colleagues, in respect of the above named individual can we as a whole service thank you for an excellent and thoroughly professional member of your staff who has been instrumental in helping us settle safely in to our new unit. Can we complement yourselves on allowing him to be with us and would recommend him as an excellent example of how partnership within the P21 scheme works positively for all groups. It is with sadness he leaves today but from a CTP perspective he will be sadly missed but we wish him every success in the future.
Mike Reeve
Head of Acute Mental Health Services (North East Lincolnshire)